Demolish
Demolition is applied at:
- Remove all types of tiles;
- Remove hard floor coverings;
- Remove sand cement screeds;
- Remove cable ducts;
- Remove piping.
Remove the floor with the breaker and / or strippers
Hard floor coverings and finishes require more strength.
Nieuwenhuis uses breakers in various weights and
categories so that there is always a perfect balance between power
and control and floor removal goes without problems.
Professional result
Professional result
Taking working hours into account
To compensate for the unavoidable noise, it is possible to adjust the working hours in the object. You can think of evenings and weekends for the floor removal.
Delivery
All projects are delivered broom clean, suitable
for further processing of the floor.
The removal of residual materials takes place in consultation.
The client remains formally the owner of the waste that arises after removing a floor.